Trafalgar High School refurbishment

The intention of this project was to create an open area learning atmosphere for the students and teachers within an existing classroom building of 250m2. It also included some additional undercover baggage storage areas to other building on the site.  The works was successfully completed with the school operating as normal. Careful planning with the principle and staff was important to assure that the works operated safety around the  sites existing occupation.

Images