St Thomas the Apostle

This was the second stage of St Thomas the Apostle Primary School. It was constructed whilst the school was in operation so there where times of the day where the site and work had to be carefully managed as not to disturb the day to day activities. The building consisted of a slab on ground with suspended slab to the second level, steelworks and lightweight framing  to both floors created the superstructure. It is clad in a mix of face brickwork, express join FC and steel sheet. Commercial glazing with select decals where a nice feature along with the angled concrete columns. This build was constructed in 6.5 months and within budget. The Catholic Education Department and Principle were extremely happy with not only the building, but the level of communication and profession we displayed throughout the project from the Kingbuilt team.