St Joseph’s Primary School

June 23, 2016 1:14 am Published by Comments Off on St Joseph’s Primary School

We are very proud to have constructed the beautiful new building at St Joseph’s Primary School in Warragul, Victoria. Like any school construction project, safety with children nearby presents a particular challenge, however this is an issue we are well used to managing having done more than 10 well-sized school extensions and renovations in the […]

St Thomas the Apostle

May 25, 2016 10:18 pm Published by Comments Off on St Thomas the Apostle

This was the second stage of St Thomas the Apostle Primary School. It was constructed whilst the school was in operation so there where times of the day where the site and work had to be carefully managed as not to disturb the day to day activities. The building consisted of a slab on ground […]

Oncology, Sale Hospital

April 15, 2016 3:36 am Published by Comments Off on Oncology, Sale Hospital

Extension and refurbishment works for the Sale Hospital Oncology Center. This project will be constructed whilst the building is in use so special consideration will be needed for the co-ordination of delivery times, noise and dust control and subcontractors. We at Kingbuilt are proud to be involved in such an important facility within a small […]

Dalkeith Heights Over 55 Retirement Village Stage 2

April 15, 2016 3:29 am Published by Comments Off on Dalkeith Heights Over 55 Retirement Village Stage 2

This project is the second stage in the Dalkeith Heights Development. It consists of 38 Apartment / Housing for over 55 residents. Some considerations when building this project include: existing residence’s, road works, staging, tight building schedule, strict budget and co-ordination of subcontractors.

Drouin Integrated Childrens Hub

September 21, 2015 10:18 pm Published by Comments Off on Drouin Integrated Childrens Hub

This is a new build with a purpose of delivering a place of learning for early child development. The site contains a building that has a total area of 355m2, carpark of 600m2 and landscaping works including raised garden beds and other soft and hard landscaping features. It is placed in an active area surrounded […]

Maffra Community Sports Club, Maffra

May 22, 2015 4:58 am Published by Comments Off on Maffra Community Sports Club, Maffra

This project consisted of extensive restoration and refurbishment works to the external and internal areas of 1600m2. A full demolition of the internally was carried out over 2 floors to make way for new areas such as, gaming, bar, lounge, TAB, commercial kitchens, cash stronghold, sanitary areas, dinning, kids play and management offices. As the […]

St Gabriel’s Primary School, Traralgon

May 22, 2015 4:31 am Published by Comments Off on St Gabriel’s Primary School, Traralgon

This project is directed by Build Eng Design as consists of extensive refurbishment of an existing classroom building with a total area of 1200m2. New finishings, insulation, roofing and joinery will create a new an improved learning space for the students. Careful consideration of deliveries and trade services are essential when operating in a occupied […]

St Josephs Parish, Warragul

May 22, 2015 4:09 am Published by Comments Off on St Josephs Parish, Warragul

Consisting of a extensive refurbishment of the existing church, the design will not only enhance the aesthetics internally, it has paid attention to the acoustics with a new 10 meter wide domed ceiling to be installed. New lighting, audio, feature doors, solid timber columns, floor coverings and painting will create some fantastic improvements for the […]

Trafalgar High School refurbishment

July 1, 2014 12:34 am Published by Comments Off on Trafalgar High School refurbishment

The intention of this project was to create an open area learning atmosphere for the students and teachers within an existing classroom building of 250m2. It also included some additional undercover baggage storage areas to other building on the site.  The works was successfully completed with the school operating as normal. Careful planning with the […]

Shared Supported Accomodation, DHS

July 1, 2014 12:33 am Published by Comments Off on Shared Supported Accomodation, DHS

KingBuilt competed this 1000m2 purpose designed project in East Gippsland for the DHS under PRO-ARK’s direction. Its use is to house and accommodate youth and the facilities staff members. Consisting of  12 apartment type rooms with  lounge, laundries, kitchen and recreational areas to service the hosts needs. It was a very successful project with the […]

Guthridge Primary School

July 1, 2014 12:33 am Published by Comments Off on Guthridge Primary School

This buildings end purpose was to be used as a multi purpose hall which incorporated a basketball court, office and storage area. Total area of the building is 620m2. It consists of concrete slab on ground, tilt panels, steel portal framing, lightweight steel cladding with some architectural features to the entry. Attention to detail when […]

Royale Blue office extension and lift

July 1, 2014 12:31 am Published by Comments Off on Royale Blue office extension and lift

This project was constructed within and around a busy office environment located in Clayton. The structure involved a lift to the 3rd level, disabled bathrooms and large lobby areas. Lightweight cladding wrapped the buildings extension to marry in with the existing facade. The structure involved concrete slab and panels tied into new and existing steel works. The […]

Catholic College Sale

June 25, 2014 12:43 am Published by Comments Off on Catholic College Sale

This project consisted of several learning areas to be converted into Student Laboratories. Works was completed during school hours so care consideration had to be adhered to as to not disturb any of the student and staff activities.

St Vincents Primary School

June 25, 2014 12:41 am Published by Comments Off on St Vincents Primary School

The stunning new building at St Vincent’s Primary School, Morwell, was one of our favourite projects. Incorporating a new gymnasium, classrooms, common rooms and locker rooms, the project adopts a seamless blend of building methods including precast concrete panels and stud walls, and metal, compressed sheet and stone claddings. Add striking angled pillars and spectacular […]

Kingbuilt_Commercial_Builder_Jeeralang_Community_Hall_9173a

Jeeralang North Community Hall

June 25, 2014 12:34 am Published by Comments Off on Jeeralang North Community Hall

Fully refurbished and extended community hall, the design incorporated fire resistant methods to help the building withstand extreme conditions.  This was an award winning building that Kingbuilt was very proud to be a part of and was completed on time within budget.

Gippsland Rotary Centenary

June 25, 2014 12:26 am Published by Comments Off on Gippsland Rotary Centenary

Click here to view a reference from Ken Peake (Chair, Committee of Management, Gippsland Rotary Centenary House Inc) in relation to this project. We are very proud to be involved in the construction of the Gippsland Rotary Centenary House, located between Traralgon and Morwell in central Gippsland, eastern Victoria. Initiated by Rotary to commemorate 100 […]

St Kierans Primary School

June 24, 2014 8:51 am Published by Comments Off on St Kierans Primary School

The commencement of the St Kierans Primary School refurbishment works was a great opportunity to expand our already impressive record with the Catholic Education Office. We’ve now completed no less than 8 Catholic School projects, and in every case, we’ve more than satisfied our clients, and delighted teachers and principals with our attention to detail, […]

Seaspray Caravan Park

June 24, 2014 8:43 am Published by Comments Off on Seaspray Caravan Park

At the Seaspray Caravan Park we built two Amenities Blocks, each with 10 showers and 15 toilets, plus a community-use Camp Kitchen and seperate Caretaker’s Residence. The styling reflects the coastal nature of the project, utilising Hardie Scyon and Axon contemporary claddings, muted colour tones and sand coloured vinyl chip flooring. The buildings are built […]

kingbuilt_commercial_builder_rosedale_pool_mg_0699c

Rosedale Pool Upgrade

June 24, 2014 8:29 am Published by Comments Off on Rosedale Pool Upgrade

A particularly rewarding project, the Rosedale Pool upgrade made a thrilling contrast between the well-used initial appearance before demolition, to the sparkling freshness of the completed new buildings, refurbished and new pools, and grounds. All buildings on the site were removed including the existing child pool, toilets/change block, kiosk and shade structures. New works included […]